Live chat

Live chat

Live chat


DCE Notice on Carry out the Market Test of the Next-Generation Trading System

2019-08-29
In order to further improve the operating efficiency of the trading system and better serve the market, DCE have completed the construction of a new generation trading system, which greatly improved the performance and capacity of the trading system. The new generation system provides two access methods: the six-phase compatible interfaces and the seven-phase of new interfaces. At the beginning launching of the new system, the members are connected through the six-phase compatible interface, and the member system does not need change, and only the access technical parameters need to be adjusted. The new seven-phase interface has been released to the market and will be opened as soon as the market is ready.
 
In order to ensure the smooth launch of the new generation trading system and the safe and stable operation of the whole market technology system, DCE schedule to conduct the first full-market networking test of the next-generation trading system on August 31 (Saturday). All members are required to arrange the relevant personnel of the trading and settlement system to participate in the test in advance. The relevant issues are hereby notified as follows:
 
1. This test verifies the functions and performance of the transaction, market and settlement system. It is recommended that members contact their respective quantitative trading clients for performance testing. All members are required to make adjustments and settings for technical system access parameters in advance in accordance with the Test Technology Access Guidelines (Attachment 1), and familiarize themselves with the test schedule and test content in advance according to the Test Business Guide (Attachment 2).
 
2. Please keep records of the test according to the "Test Feedback Form (Sample Form)" (Attachment 3), and provide feedback of the test results through the production member service system after the test.
 
3. Please carefully backup and recover the production data and configuration files before and after testing, and clean up the counter system logs to ensure normal operation of the system on next Monday.
 
During the test, members shall download and use test data from the member service system, the electronic warehouse receipt system was suspended to use, and the exchange website delayed market data will show the test data.
 

 
News Link: http://www.dce.com.cn/dalianshangpin/yw/fw/jystz/ywtz/6182922/index.html